Pubblicati da Acciaio energetico

Tubi in acciaio senza saldatura laminati a caldo vs laminati a freddo/trafilati

Introduction In industries like oil and gas, petrochemicals, offshore engineering, and machinery manufacturing, the choice between hot-rolled seamless steel pipe and cold-rolled/drawn seamless steel pipe plays a critical role in determining the performance, durability, and cost-efficiency of equipment and projects. With demanding requirements for dimensional accuracy, mechanical properties, and durability, choosing the right pipe type […]

Introduzione del tubo rivestito in 3LPE

Introduction The base materials of 3LPE Coated Line Pipe include seamless steel pipes, spiral welded steel pipes, and straight seam welded steel pipes. Three-layer polyethylene (3LPE) anti-corrosion coatings are widely used in the oil pipeline industry for their good corrosion resistance, water vapor permeability resistance, and mechanical properties. 3LPE anti-corrosion coatings are crucial to the […]

Progetto PAPA per il serbatoio di stoccaggio dell'olio di petrolio

Progetto di serbatoi di stoccaggio di petrolio PAPA Progetto: serbatoi di stoccaggio di petrolio Luogo: Cambogia Durata: novembre 2017 – maggio 2018 Prodotto richiesto: tubi in acciaio, raccordi per tubi, flange per tubi, piastre in acciaio Specifiche: API 5L Gr.B, ASTM A106 Gr.B, ASME B16.9, ASME B16.5, ASTM A36 Quantità: 800 tonnellate di piastre, 1050 tonnellate di tubi in acciaio, 6330 pezzi di raccordi per tubi e flange, bulloni e dadi […]

Progetto del terminale di olio combustibile PetroEcuador

Progetto del terminale di olio combustibile PetroEcuador Progetto: Terminale Troncal Ubicazione: Ecuador Durata: luglio 2017 – aprile 2020 Prodotto richiesto: Tubi in acciaio, raccordi per tubi, flange per tubi Specifiche: API 5L/A53/A106 Gr.B; ASTM A234 WPB ASME B16.9; ASTM A36; ASTM A105/105N ASME B16.5; ASTM A193 Gr.B7 e ASTM A194 Gr.2H Quantità: 2031 tonnellate di tubi in acciaio; 320 tonnellate di acciaio […]

Progetto di gasdotto per lo smaltimento delle mine in Russia

Russia Mine Tailing Pipeline Project Project:  Mine Tailing Line Location: Russia Duration: February 2015 – November 2016 Required Product: Steel Pipes, Pipe Flanges Specifications: API 5L PSL 1 Gr.B, EN 1092-1 Type 01 Quantity: 700 Tons LSAW Line Pipes, 1200 Pieces Pipe Flanges Use: Mine Tailing Pipeline System