Modified Pipe Fittings

Pneumatic Waste Collection System (PWCS) Project

Urban Pneumatic Waste Collection System Project

Project: Urban PWCS
Location: Singapore
Duration: July 2015 – April 2017

Required Product: 3LPE Coated Steel Pipes, Modified Pipe Fittings
Specifications: API 5L Gr.B; ASTM A234 WPB ASME B16.9; DIN 30670-2012
Quantity: 1200 Tons of 3LPE Coated Steel Pipes; 1300 Pieces of Modified Pipe Fittings
Use: Collecting and Conveying Household Waste

PTT Cambodia Oil Jetty Extension Project

PTT Cambodia Oil Jetty Extension Project

The PTT Cambodia Oil Jetty Extension Project aims to enhance Cambodia’s oil import and handling capacity, supporting the region’s growing energy needs. This project involves the expansion and upgrading of the existing oil jetty to improve the efficiency of oil and petroleum product loading and unloading.

Project: EPCC Submarine Pipeline (3 lines = 2,880 m)
Location: PTT Ream Oil Terminal
Duration: November 2013 – May 2014

Project Timeline

  • Project Start: Q1 2013
  • Design and Planning: Q1 – Q2 2013
  • Construction Preparation: Q3 2013
  • Main Construction Phase: Q4 2023 – Q2 2014
  • Project Completion: Q2 2014

Required Product Specifications and Quantities

  1. Steel Pipes
    • Specifications: API 5L Gr.B
    • Quantity: 2,880 meters
    • Use: Oil pipeline system
  2. Corrosion Coatings
    • Specifications: 3LPE coating, epoxy zinc primer
    • Quantity: To cover all steel structure surfaces
    • Use: Corrosion prevention and lifespan extension