PDVSA Oil Block Drilling Project

PDVSA Oil Block Drilling Project

Project:  PDVSA Oil Block Drilling Project
Location: Venezuela
Duration: February 2016 – July 2017

Required Product: Oil Tubing
Specifications: API 5CT
Quantity: 750 Tons
Use: Oil Tubing insert in Casing Pipe

PetroEcuador Fuel Oil Terminal Project

PetroEcuador Fuel Oil Terminal Project

PetroEcuador Fuel Oil Terminal Project

Project: Troncal Terminal
Location: Ecuador
Duration: July 2017 – April 2020

Required Product: Steel Pipes, Pipe Fittings, Pipe Flanges
Specifications: API 5L/A53/A106 Gr.B; ASTM A234 WPB ASME B16.9; ASTM A36; ASTM A105/105N ASME B16.5; ASTM A193 Gr.B7 & ASTM A194 Gr.2H
Quantity: 2031 Tons of Steel Pipes; 320 Tons of Steel Plates; 30556 Pieces of Pipe Fittings and Flanges, Valves, Stud Bolts & Hexagonal Nuts
Use: Store Fuel Oil
Coatings Specifications: Zinc-rich Epoxy Primer Coating, Brand: Hempel
Use: Prevention of seawater and sea salt corrosion and lifespan extension

Russia Mine Tailing Pipeline Project

Russia Mine Tailing Pipeline Project

Project:  Mine Tailing Line
Location: Russia
Duration: February 2015 – November 2016

Required Product: Steel Pipes, Pipe Flanges
Specifications: API 5L PSL 1 Gr.B, EN 1092-1 Type 01
Quantity: 700 Tons LSAW Line Pipes, 1200 Pieces Pipe Flanges
Use: Mine Tailing Pipeline System

TOTAL ENERGIES Oil Storage Tank Project

TOTAL ENERGIES Oil Storage Tank Project

Project: Oil Storage Tanks
Location: Cambodia
Duration: November 2015 – May 2016

Required Product: Steel Pipes, Pipe Fittings, Pipe Flanges, Steel Plate
Specifications: ASTM A106 Gr.B, ASME B16.9, ASME B16.5, ASTM A36
Quantity: 380 Tons Plates, 300 Tons Steel Pipes, 2330 Pieces Pipe Fittings and Flanges, Bolt & Nuts
Use: Tank Farm Oil Pipeline System
Coatings Specifications: Epoxy zinc-rich primer Coating
Use: Prevention of sea salt corrosion and lifespan extension

Modified Pipe Fittings

Pneumatic Waste Collection System (PWCS) Project

Urban Pneumatic Waste Collection System Project

Project: Urban PWCS
Location: Singapore
Duration: July 2015 – April 2017

Required Product: 3LPE Coated Steel Pipes, Modified Pipe Fittings
Specifications: API 5L Gr.B; ASTM A234 WPB ASME B16.9; DIN 30670-2012
Quantity: 1200 Tons of 3LPE Coated Steel Pipes; 1300 Pieces of Modified Pipe Fittings
Use: Collecting and Conveying Household Waste

PTT Cambodia Oil Jetty Extension Project

PTT Cambodia Oil Jetty Extension Project

The PTT Cambodia Oil Jetty Extension Project aims to enhance Cambodia’s oil import and handling capacity, supporting the region’s growing energy needs. This project involves the expansion and upgrading of the existing oil jetty to improve the efficiency of oil and petroleum product loading and unloading.

Project: EPCC Submarine Pipeline (3 lines = 2,880 m)
Location: PTT Ream Oil Terminal
Duration: November 2013 – May 2014

Project Timeline

  • Project Start: Q1 2013
  • Design and Planning: Q1 – Q2 2013
  • Construction Preparation: Q3 2013
  • Main Construction Phase: Q4 2023 – Q2 2014
  • Project Completion: Q2 2014

Required Product Specifications and Quantities

  1. Steel Pipes
    • Specifications: API 5L Gr.B
    • Quantity: 2,880 meters
    • Use: Oil pipeline system
  2. Corrosion Coatings
    • Specifications: 3LPE coating, epoxy zinc primer
    • Quantity: To cover all steel structure surfaces
    • Use: Corrosion prevention and lifespan extension