PetroEcuador Fuel Oil Terminal Project

PetroEcuador Fuel Oil Terminal Project

PetroEcuador Fuel Oil Terminal Project

Project: Troncal Terminal
Location: Ecuador
Duration: July 2017 – April 2020

Required Product: Steel Pipes, Pipe Fittings, Pipe Flanges
Specifications: API 5L/A53/A106 Gr.B; ASTM A234 WPB ASME B16.9; ASTM A36; ASTM A105/105N ASME B16.5; ASTM A193 Gr.B7 & ASTM A194 Gr.2H
Quantity: 2031 Tons of Steel Pipes; 320 Tons of Steel Plates; 30556 Pieces of Pipe Fittings and Flanges, Valves, Stud Bolts & Hexagonal Nuts
Use: Store Fuel Oil
Coatings Specifications: Zinc-rich Epoxy Primer Coating, Brand: Hempel
Use: Prevention of seawater and sea salt corrosion and lifespan extension