PTT Cambodia Oil Jetty Extension Project
PTT Cambodia Oil Jetty Extension Project
The PTT Cambodia Oil Jetty Extension Project aims to enhance Cambodia’s oil import and handling capacity, supporting the region’s growing energy needs. This project involves the expansion and upgrading of the existing oil jetty to improve the efficiency of oil and petroleum product loading and unloading.
Project: EPCC Submarine Pipeline (3 lines = 2,880 m)
Location: PTT Ream Oil Terminal
Duration: November 2013 – May 2014
Project Timeline
- Project Start: Q1 2013
- Design and Planning: Q1 – Q2 2013
- Construction Preparation: Q3 2013
- Main Construction Phase: Q4 2023 – Q2 2014
- Project Completion: Q2 2014
Required Product Specifications and Quantities
- Steel Pipes
- Specifications: API 5L Gr.B
- Quantity: 2,880 meters
- Use: Oil pipeline system
- Corrosion Coatings
- Specifications: 3LPE coating, epoxy zinc primer
- Quantity: To cover all steel structure surfaces
- Use: Corrosion prevention and lifespan extension